Studies suggest the country needs roughly 5,000 miles of new high-voltage transmission lines per year to triple interregional capacity by 2050. The U.S. is building about 500.
That gap carries real affordability and reliability risks. Larger, better-connected grids reduce consumer costs and help regions share power during shortages, limiting the scale of blackouts.
Demand Is Not Waiting
Rising load from new industries is pressing aging infrastructure toward its limits.
Data centers, electric vehicles, and energy-intensive manufacturing are driving electricity demand higher. The infrastructure carrying that load was largely designed for a different era and a different demand profile.
A Coordination Failure, Not an Engineering One
The core bottleneck is not a lack of technology but a collision of competing jurisdictions.
A Policy Forum published in Science by researchers Madeline Yozwiak, David G. Victor, and M. Granger Morgan identifies the central obstacle as fragmented jurisdictional authority. Local, state, regional, federal, and private actors each hold veto power over projects whose benefits extend well beyond the borders they control.
Utility self-interest compounds the jurisdictional problem. Utilities may face limited economic incentives to support interregional connections if those links reduce local market power or expose customers to greater competition.
Fixes That Don’t Require New Rights-of-Way
Two near-term upgrades can add meaningful capacity without breaking new ground.
Reconductoring, which means replacing existing wires with higher-capacity conductors, moves more power through corridors already built. Converting some alternating-current lines to direct current can further increase transfer capability on those same routes, though conversion is project-specific and is not feasible on every existing corridor.
For longer distances, VSC-HVDC (Voltage-Sourced Converter High-Voltage Direct Current) systems offer another option. VSC-HVDC lines carry large amounts of power over long distances and can be buried along existing highway and railroad rights-of-way, reducing many of the land-acquisition conflicts that stall conventional overhead projects.
Federal Authority Already on the Books
The authors argue that existing statutory powers, used more aggressively, could cut through entrenched permitting conflicts.
The Department of Energy holds authority to designate National Interest Electric Transmission Corridors. FERC may then exercise limited permitting authority within those designated corridors when specific statutory conditions are met, providing a federal backstop in certain circumstances rather than a broad override of state decisions.
What Other Countries Already Know
International deployments offer tested models that the U.S. has yet to adapt at scale.
Britain, Australia, India, China, and several European nations have deployed underground HVDC and advanced power electronics in various applications. Yozwiak, Victor, and Morgan propose a cross-national forum to adapt those approaches for the U.S. context, drawing on organizations including the National Association of Regulatory Utility Commissioners, the Regulatory Assistance Project, the Department of Energy, and the Electric Power Research Institute.
One Table, Many Stakeholders
A proposed national commission would bring the competing decision-makers into one negotiating process.
The authors also propose a Presidential-Congressional Transmission Commission to bring federal and state policymakers, regulators, and utilities together. Its scope would cover permitting reform and potential expansion of FERC’s corridor authority, as well as market incentives and possible compensation for communities asked to host infrastructure whose benefits flow primarily elsewhere , a dynamic explored further in how power companies can Seize Your Land for such projects.
The Missing Piece
Engineering solutions already exist; the gap is in governance.
What is absent is a structure that aligns national benefits with local costs across jurisdictions that do not share the same priorities. Without that alignment, the annual build rate is likely to stay far short of what studies say the country needs.






























