Voters Across 10 States Rejected Data Centers, but Anthropic Is Buying Gas Power Anyway!

Voters in 10 states already pushed back on data centers as Anthropic locks in 1.7 gigawatts of fossil-fuel capacity

C. da Costa Avatar
C. da Costa Avatar

By

Image: Deposit Photos – Gadget Review

Key Takeaways

Key Takeaways

  • Anthropic reportedly secured 1.7 gigawatts of gas-fired power in a $3.4 billion deal.
  • Voters across 10 states backed data-center restrictions in 40 out of 41 ballot measures.
  • Anthropic has not publicly addressed emissions controls or renewable offsets for this fossil-fuel commitment.

Reuters, citing the Financial Times, reported that Anthropic agreed in late September to take over generator commitments from San Antonio-based OnePWR Solutions. The Financial Times characterized the deal as valued at approximately $3.4 billion for 1.7 gigawatts of gas-fired generation capacity. Claude’s new feature for workplace monitoring illustrates just how broadly Anthropic is expanding its footprint beyond raw compute.

Reuters said it could not independently verify the Financial Times account, and neither Anthropic nor OnePWR had responded to requests for comment at the time of publication. The arrangement reportedly included engineering and construction capabilities but did not involve acquiring OnePWR itself or transferring its employees to Anthropic.

Why This Deal Happened

Anthropic reportedly did what any company flush with capital would do: absorb someone else’s place in a scarce equipment queue.

OnePWR had reportedly placed the original Caterpillar generator order roughly two years earlier but needed financing to close it. Anthropic reportedly considered becoming a OnePWR customer before taking over the existing commitments outright.

That sequence illustrates a recognizable pattern. When grid interconnection queues and equipment manufacturing slots stretch out, companies with sufficient resources can bypass the wait by assuming someone else’s position in line.

The Environmental Problem

The specific emissions figures for these units remain unestablished in available reporting, but the structural concern is clear.

Gas-fired generators produce carbon dioxide and conventional air pollutants. The emissions profile, installation locations, permitting status, and operating schedule for Anthropic’s reported equipment remain unconfirmed in available reporting. That means precise climate costs cannot be stated as established fact.

What the reporting does establish is a direction. A frontier AI laboratory is reportedly locking in fossil-fuel generation infrastructure amid increasing scrutiny of the industry’s climate footprint. These questions extend to data-center resource consumption across the broader AI industry.

The Public Is Already Voting

Local communities are not waiting for technology companies to self-regulate on data-center expansion.

Voters across 10 states considered 41 local data-center-related ballot measures in early November 2026, according to Ballotpedia and CNBC reporting. Voters favored limiting data-center development in 40 of the 41 contests.

Ballotpedia reported that 27 measures limited development or expressed opposition, including five full bans, 12 partial bans, three six-month moratoriums, and measures requiring voter approval or financial guarantees in certain circumstances. The lone exception was Harwood, North Dakota, where voters rejected an added review requirement for certain industrial projects, including data centers.

Those results span 10 states and dozens of communities. That is not a niche protest. It is a geographically dispersed signal that resistance to AI Data Centers is widening.

What the Industry Owes the Public

Anthropic has the resources to account for this deal publicly. It has not yet demonstrated the urgency to do so.

If AI labs need this much electricity this fast, a credible public account of applicable emissions controls, renewable offsets, and grid transition plans is a reasonable minimum. The Financial Times described this as the largest known single purchase of power-generation equipment by an AI laboratory. That characterization has not been independently verified, but if it holds, the absence of any public response becomes much harder to defend.

The industry has the financial resources to provide those answers. What it has not demonstrated is the will to treat the question as urgent.

Share this

At Gadget Review, our guides, reviews, and news are driven by thorough human expertise and use our Trust Rating system and the True Score. AI assists in refining our editorial process, ensuring that every article is engaging, clear and succinct. See how we write our content here →